Customer Photo Solutions Provided
Mike M.
Chili, NY
March 23, 2013

Provide and install Grate Drain Antimicrobial drainage system with accessible ports. Install dimple shield for water transfer across footer. Install finish shield. Install exterior drainage. Install ice cop to prevent freezing on exterior drainage. Remove outer walls.

Bill
Rochester, NY
March 12, 2013

Construct walls, metal stud construction for mold control. Provide and install wall outlets. Provide and install insulation in outer walls. Provide and install mold and water resistant drywall and finish smooth.

Aaron M.
Rochester, NY
March 4, 2013

Provide and install Grate Drain Antimicrobial drainage system with accessible ports. Install dimple shield for water transfer across footer. Install finish shield. Install ice cop. Provide and install Grate Sump and Fast Pump.

Karlyn
Rochester, NY
February 1, 2013

Provide and install Grate Drain Antimicrobial drainage system with accessible ports. Provide and install Fast Sump pump. Provide and install Grate Sump. Install dimple shield. Remove existing walls.

Rick N.
Webster, NY
January 22, 2013

Install laminate flooring. Repaint existing base molding. Install trim around existing basement support poles. Install access door for plumbing clean out.

Karen P. and Andy D.
Rochester, NY
January 18, 2013

Provide and install suspended ceiling. Provide and install adjustable heat runs. Provide and install base molding. Provide and install doors. Construct soffit at stairway bottom. Construct soffit around main heating ducts. Remove existing wall and install concrete block wall. Install cabinets, countertop, sink and faucets in laundry area. Install cable jacks. Install ceramic tile in bathroom and entryway. Rework old electric and bring up to code. Provide and install pocket door. Install bathroom cabinet and shower door. Construct walls, metal stud construction for mold control. Provide and install insulation in outer walls. Provide and install mold and water resistant drywall and finish smooth. Provide and install wall outlets. Provide and install wall switches. Provide and install recessed lights. Provide and install smoke detector. Install trim around existing basement windows. Provide and install pocket door. Install laminate flooring. Provide and install double swinging doors. Provide and install doors. Install electrical panel access door. Install access door for water meter. Install toilet, vanity, shower units and faucets. Provide and install bathroom exhaust fan. Install GFI outlet. Install vanity light.

Daniel W.
Newark, NY
January 7, 2013

Santa Fe classic whole basement air system with dust kit.

Teresa W.
Rochester, NY
December 11, 2012

Santa Fe Classic Whole Basement Air System. Clean Mold on Outer Walls. Grate Drain Anti-Microbial Drainage System with Accessible Ports. Grate sump 2 liners. 1 ft finish shield. Blue angel 1/2 HP. Thermalshield-thermal moisture wall barrier. PHCC1730 Dual switch. 140 AMP battery. Wall removal.

Leonard L.
Henrietta, NY
December 3, 2012

Remove insulation from outer walls in finished area. Drill weep holes around basement perimeter. Construct walls, metal stud construction for mold control. Install 13 recessed lights, 11 wall outlets, 5 wall switches and 1 cable jack. Install insulation walls. Install mold and water resistant drywall approximately, finished smooth. Install trim around 1 basement support pole and 2 basement windows. Install 2 swinging doors, six panel masonite with trim. Construct soffit around main heating duct. Install paint grade molding. Install suspended ceiling, 2x2 Cortega tegular tile. Construct soffit at stairway bottom. Install risers on the back of stairway for carpeting. Install egress window white double pane, Anderson casement window with rock look. Outer surround and polycarbonate cover. Construct landing at stairway bottom. Prime, caulk and paint all walls, doors and trim.

Ron S.
Rochester, NY
November 28, 2012

Santa Fe classic whole basement air system. Grate Drain anti-microbial drainage system with accessible ports. 2 grate sump liners. 1 ft. finish shield. Blue angel 1/2 HP. ThermalShield-Thermal moisture wall barrier. PHCC1730 dual switch. 140 AMP battery. Wall removal.

Chris Tina K.
Rochester, NY
November 19, 2012

Drill perimeter weep holes.

Dick S.
Rochester, NY
October 17, 2012

Remove interior walls and suspended ceiling. Construct walls, metal stud construction for mold control. Install florescent lights, 7 recessed lights, 2 closet florescent lights, 6 wall switches. Remove existing fuse box and replace with 150 amp service and install 10 wall outlets. Install insulation in outer walls. Install mold and water resistant drywall, finished smooth. Provide access doors for gas meter, water meter, and electrical panel. Install 4 swinging doors, all six panel masonite with trim. Install paint grade base molding. Install risers on back of stairway for carpeting. Install trim around 1 basement support pole. Construct open stairway with oak cap. Construct closet with pole and shelf and combination shelving. Construct soffit around main heating duct. Install laminate flooring in utility room. Install suspended ceiling. Prime, caulk and paint all walls, doors and trim.

Rich S.
Rochester, NY
October 15, 2012

Grate Drain anti-microbial drainage system with accessible ports Grate sump 2 liners. 1 ft. finish shield. Blue angel 1/2 HP. Wall Removal.

Mary G.
Rochester, NY
September 17, 2012

Santa Fe classic whole basement air system. PHCC1730 dual switch, 140 AMP battery.

Paul K.
Rochester, NY
September 6, 2012

Grate Drain anti-microbial drainage system with accessible ports. Grate sump 2 liners. 1 ft. finish shield. Blue angel 1/2 HP. ThermalShield-thermal moisture wall barrier. PHCC1730 dual switch. 140 AMP battery.

Pat F.
Rochester, NY
August 16, 2012

Santa Fe classic whole basement air systems. Grate Drain Anti-microbial drainage system with accessible ports. Grate sump 2 liners. 1 ft finish shield. Blue angel 1/2 HP. ThermalShield-Thermal moisture wall barrier PHCC1730 dual switch. 140 AMP battery.

Scott B.
Pittsford, NY
July 30, 2012

Install egress window with rock look outer surround and polycarbonate cover. Remove all dirt to backyard.

Pana T.
Rochester, NY
July 30, 2012

Santa Fe classic whole basement air system. Drill perimeter weep holes. Clean mold on outer walls. Block seal outer walls. Grate Drain anti-microbial drainage system with accessible ports. Grate sump 2 liners. 1 ft finish shield. Blue angel 1/2 HP. ThermalShield-Thermal moisture wall barrier. PHCC1730 dual switch. 140 AMP battery. Wall removal.

Rosemary P.
Rochester, NY
July 20, 2012

Install a ice line for refrigerator. Install kitchen cabinets according to blueprint. Install sink, dishwasher, garbage disposal, microwave. Install all trim moldings according to blueprint. Install 2 lighting fixtures. Install ceramic tile flooring. Install glass tile backsplash. Install 2 additional wall outlets and relocate wall switching. Enlarge existing doorway, relocate heating duct and wall switch.

Frank C.
Penfield, NY
July 17, 2012

Construct walls, wood stud construction. Install 4 outlets, 1 sub panel, 20 wall outlets, 10 wall switches, 4 sconce lights, 1 smoke detector, 4 fluorescent lights, 14 recessed lights, 1 bar light, 1 bathroom exhaust fan, 1 GFI outlet and 2 utility lights. Install insulation in outer walls. Install mold and water resistant drywall, finished smooth. Install suspended ceiling, 2x2 Cortega tegular tile. Install 5 heat runs in suspended ceiling with adjustable dampers. Install paint grade base molding. Install trim around 1 existing basement window/install 1-six panel solid core door. Install toilet, vanity and faucet. Install 8 swinging doors and 4 bifold doors all six panel masonite with trim. Install insulation in workshop area ceiling for sound baffling. Construct soffit at stairway bottom and around main heating duct. Construct open stairway with oak cap. Install countertop with shelving above, order to provide countertop. Install access door for plumbing cleanout. Prime, caulk, and paint all walls doors and trim.

Frank C.
Penfield, NY
July 17, 2012

Construct walls, wood stud construction. Install 4 outlets, 1 sub panel, 20 wall outlets, 10 wall switches, 4 sconce lights, 1 smoke detector, 4 fluorescent lights, 14 recessed lights, 1 bar light, 1 bathroom exhaust fan, 1 GFI outlet and 2 utility lights. Install insulation in outer walls. Install mold and water resistant drywall, finished smooth. Install suspended ceiling, 2x2 Cortega tegular tile. Install 5 heat runs in suspended ceiling with adjustable dampers. Install paint grade base molding. Install trim around 1 existing basement window/install 1-six panel solid core door. Install toilet, vanity and faucet. Install 8 swinging doors and 4 bifold doors all six panel masonite with trim. Install insulation in workshop area ceiling for sound baffling. Construct soffit at stairway bottom and around main heating duct. Construct open stairway with oak cap. Install countertop with shelving above, order to provide countertop. Install access door for plumbing cleanout. Prime, caulk, and paint all walls doors and trim.

Hyekyun R.
Pittsford, NY
July 11, 2012

Install additional 1 outlet. Install additional 1-3 way switch. Install 2 additional pull chain lights. Install 2 additional closet light fixtures. Install 2 additional sconce lights. Relocate 1 duct. Construct double access door. Construct trim box in laundry area. Install 2 cable lines.

Kyle T.
Rochester, NY
July 10, 2012

Santa Fe classic whole basement air system.

Tyrone R.
Rochester, NY
June 13, 2012

Santa Fe classic whole basement air system.

Pat B.
North Chili, NY
June 10, 2012

Remove outer wall insulation for moisture control. Drill weep hole around basement perimeter for proper drainage. Construct walls, metal stud construction for mold control. Install 10 wall outlets, 12 recessed lights, 4 wall switches and 1 smoke detector. Install insulation in outer walls. Install mold and water resistant drywall and finish smooth. Install 1 double swinging door and 2 swinging doors, all six panel masonite. Install trim around 2 basement windows and 1 basement support pole. Install suspended ceiling, 2x2 Cortega tegular tile. Install 3 he runs in suspended ceiling with adjustable dampers. Install paint grade base molding. Construct open stairway with oak cap. Install Santa Fe whole basement dehumidification and air purifying system. Construct soffit at stairway bottom and around main heating duct. Change existing round ducts to oval for ceiling clearance. Provide access door for electrical panel. Construct shelf unit with piano hinge to conceal safe.